Architectural pencil sketch of a rundown California house turning into a photo of the same home fully renovated, on blueprint paper with a drill, hammer, level and pencil
Before & after

Start to Finish

The same spot photographed at each stage of the job.

Apartment dry-out and rebuild

  1. Drying outLiving area
  2. FinishedLiving area
  3. Drying outKitchen
  4. FinishedKitchen
  5. Drying outAccent wall
  6. FinishedAccent wall
Three spots, each photographed during drying and after the rebuild: new flooring, trim and paint.

Apartment rebuild: living area

  1. 1Framing
  2. 2Drywall
  3. 3Floors in
  4. 4Finished
Stages of an apartment rebuild, looking toward the balcony door: open framing, taped drywall, new floors, then the finished kitchen and living area.

Apartment rebuild: entry and closets

  1. 1Framing
  2. 2Drywall and mud
  3. 3Finished
Entry door, coat closet and laundry closet, from open framing to a finished unit with a stacked washer and dryer.

Apartment rebuild: bedroom

  1. 1Drywall
  2. 2Painted
  3. 3Finished
A bedroom from drywall to a finished room with a dark accent wall and new flooring.

Apartment rebuild: bathroom

  1. 1Drywall
  2. 2Fixtures on
  3. 3Finished
A tub-shower bathroom from drywall to finished, with the new surround, fixtures and flooring in place.

Balcony deck resurfacing

  1. 1Before
  2. 2Before
  3. 3After
  4. 4After
A worn, stained balcony deck resurfaced with a new speckled finish.

Tub-shower wall repair

  1. 1Opened up
  2. 2New backer board
  3. 3Prepped for the panel
  4. 4New panel
  5. 5Fixtures back on
From one of our own jobs: a section of a tub-shower wall, opened up and rebuilt layer by layer instead of replacing the whole surround.

Bathroom ceiling around the exhaust fan

  1. 1Before
  2. 2Patched and primed
  3. 3Painted
Peeling ceiling around a bathroom fan: patched, primed and painted, with a new grille on the fan.

Bathroom wall patch and paint

  1. 1Patched
  2. 2Painted
Drywall patches next to a vanity mirror, then the same wall painted.
Step by step

More Jobs in Progress

A few key stages from each job, in the order the work was done.

White kitchen and living area

  1. 1Wall repairs
  2. 2Cabinets going in
  3. 3Finished
Walls and ceiling repaired, new cabinets fitted, then the finished kitchen with new flooring.

Basement bedroom

  1. 1Framing
  2. 2Drywall
  3. 3Finished
A basement room taken from framing and insulation to drywall, then finished with paint, closet doors and flooring.

Basement bathroom

  1. 1Floor open
  2. 2Finished
The same bathroom with the tub surround tiled and the floor still open, then finished.

Basement floor repair

  1. 1Before
  2. 2Patched
  3. 3Finished
A damaged section of the basement slab cut out and patched, then the whole floor refinished.

Insulation and wood ceiling

  1. 1Insulation
  2. 2Ceiling going up
  3. 3Ceiling finished
Insulation and vapor barrier installed, then a tongue-and-groove wood ceiling put up over the same room.

Gray kitchen and flooring

  1. 1New flooring
  2. 2Kitchen cabinets
New flooring throughout and the gray kitchen cabinets being installed.

New siding on a manufactured home

  1. 1House wrap
  2. 2Siding going up
  3. 3Finished
House wrap first, then dark horizontal siding, then the finished home from the yard.

Siding around a picture window

  1. 1House wrap
  2. 2Finished
House wrap around the large front window, then the same wall finished in gray siding with white trim.

Window replacement

  1. 1Opening
  2. 2Windows set
  3. 3Trimmed
The window opening prepared, the new windows set and taped, then trimmed in white.

Window trim and deck frame

  1. 1Window trim
  2. 2Deck frame
  3. 3Side view
Siding and trim around the arched windows, and a new timber frame for the deck along the side of the house.

Exterior sheathing and house wrap

  1. 1Sheathing
  2. 2House wrap
Wood sheathing on the walls, then house wrap going on around the entry.

Roof framing and metal roofing

  1. 1Deck
  2. 2Rafters
  3. 3Insulation
  4. 4Metal roof
Deck, rafters and insulation on a small outbuilding, then the new metal roof.

Concrete foundation wall

  1. 1Rebar
  2. 2Forms
  3. 3Wall poured
Rebar placed along the slab edge, forms built, then the wall poured and block work started.

Wall waterproofing and drain

  1. 1Trench
  2. 2Waterproofing
  3. 3Drain pipe
  4. 4Gravel
The trench dug out along the wall, waterproofing coated on, a membrane and drain pipe laid, then gravel on top.

Kitchen countertop and sink

  1. 1Before
  2. 2Finished
The same kitchen before and after the countertop and sink went in.

Kitchen and vanity drains

  1. 1Kitchen sink
  2. 2Vanity
New drain lines under the kitchen sink and the bathroom vanity.
Our work

A Look at Our Work

Handyman repairs and full renovations from our own jobs.

Need something like this done?

Get in touch

Let’s Work
Together.

Tell us about the job and where the property is. We’ll get back to you within 24 hours.

What do you need help with? Select all that apply
Where is the property? County
Chat on WhatsApp